Final | 4/23/2012 | 4/26/2012 | 4/26/2012 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Final | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PART |
Jim Johnson
|
|
|
Early afteroon please. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas need to have existing backflow for make up water to boiler tested and certified for final contractor to recall when ready
|
Final | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|