Final | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | PASS |
Bill VanDegrift
|
|
|
|
Final | 5/9/2012 | 5/10/2012 | 5/10/2012 | A | FAIL |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Stephanie Brown bad joint on furnace b-vent and no access to house will meet at 3 pm
|
Final | 5/8/2012 | 5/9/2012 | 5/9/2012 | A | NH |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Stephanie Brown no access locked
|
Rough-in | 4/11/2012 | 4/11/2012 | 4/11/2012 | P | PASS |
Dixie Fellows
|
|
|
The manual J has been re-submitted and approved by Troy. Any questions please call >> Inspection requested via web by Stephanie Brown...r/i ok
|
Rough-in | 4/9/2012 | 4/10/2012 | 4/10/2012 | P | FAIL |
Eric Strole
|
|
|
Duct Blasting Witness 2:30 . Please confirm with Scott ###-#### >> Inspection requested via web by Stephanie Brown-20 lb gas test ,duct blast pass. need central vent per manual j.
|
Rough-in | 4/4/2012 | 4/6/2012 | 4/6/2012 | P | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown-Need approved stamped manual-j on site for rough-in inspection. Gage for gas test will not zero out. Change gage and retest.
|