Final | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rick Montgomery
|
Final | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | PART |
Alan Hauser
|
|
|
seal around gas pipe penetration of foundation and then we will be done. thanks
|
Final | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | PEND |
Dixie Fellows
|
|
|
Please call before to meet Reggie ###-#### -- or Rick with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Montgomery....rescheduled for alan for tues am
|
Rough-in | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | FAIL |
Alan Hauser
|
|
|
replace exposed gasline in contact with soil with factory wrapped pipe and wrap elbow and up 3 1/2" above soil
|
Mec-Aging Inspection | 10/8/2012 | 10/8/2012 | 10/9/2012 | | CANC |
Alan Hauser
|
|
|
|
Rough-in | 4/17/2012 | 4/17/2012 | 4/17/2012 | P | PART |
Alan Hauser
|
|
|
check gas line installation at final
|
Rough-in | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | FAIL |
Alan Hauser
|
|
|
correction notice posted inside living room
|