Final | 7/6/2012 | 7/6/2012 | 7/6/2012 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 4/24/2012 | 4/24/2012 | 4/24/2012 | A | CANC |
Eric Strole
|
|
|
This was ready yesterday afternoon and called in yesterday for an afternoon inspection but I don''t think was inspected so if it wasn''t it needs done this am. It''s a mechanical re-inspection. Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
Rough-in | 4/23/2012 | 4/23/2012 | 4/23/2012 | P | PASS |
Bill VanDegrift
|
|
|
Reinspection. Call ###-#### if any issues.. Phone #: ###-#### >> Inspection requested via web by Konrad Swartz ri 20# test fire place ok will do duct blaster on final
|
Conference | 4/19/2012 | 4/20/2012 | 4/20/2012 | A | FAIL |
Bill VanDegrift
|
|
|
Crawl space done now Rough in re inspect with gas pressure and fireplace Phone #: ###-#### >> Inspection requested via web by Konrad Swartz 1) provide transfer air to master bedroom 2) provide 6" fresh air to return air plenum 3)remove expandable foam from around b-vent penatrations 4) 20# gas test ok
|
Rough-in | 4/17/2012 | 4/17/2012 | 4/17/2012 | P | FAIL |
Dixie Fellows
|
|
|
conrad ###-####....duct in crawl needs to be done at r/i with a duct blaster
|
Conference | 4/17/2012 | 4/17/2012 | 4/17/2012 | P | CANC |
Dixie Fellows
|
|
|
re inspect man j is there rough in w/ gas pressure >> Inspection requested via web by Konrad Swartz...this should have been a r/i
|
Rough-in | 4/16/2012 | 4/17/2012 | 4/17/2012 | A | NR |
Alan Hauser
|
|
|
no approved plans on site
|