Final | 8/15/2012 | 8/15/2012 | 8/15/2012 | P | PASS |
Eric Strole
|
|
|
Thanks, jeff Phone #: ###-#### >> Inspection requested via web by Andrea Creek
|
Rough-in | 6/27/2012 | 6/27/2012 | 6/27/2012 | P | PASS |
Eric Strole
|
|
|
brian will be on job site. hvac rough and gas piping pressure test Phone #: ###-#### >> Inspection requested via web by Andrea Creek-20 lb gas test and rough-in pass.
|