Final | 11/1/2012 | 11/1/2012 | 11/1/2012 | P | PASS |
Dixie Fellows
|
|
|
contact griff with any questions...signed the card
|
Final | 10/30/2012 | 10/30/2012 | 10/30/2012 | P | PART |
Dixie Fellows
|
|
|
larry....walked the roof and checked all equipment and gas connections...will final as soon as TML is ready
|
Final | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | PEND |
Dixie Fellows
|
|
|
if questions Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann...WAITING ON TML
|
Final | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | NR |
Dixie Fellows
|
|
|
if questions please call Larry ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann...larry cancelled until mon am
|
Final | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PART |
Dixie Fellows
|
|
|
if questions contact Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann....waiting for other contractors to schedule their finals
|
Pressure Test | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PASS |
Dixie Fellows
|
|
|
terry...guage by pizza oven...60lb gas from meter to all rtu's and last kitchen hood ok...all gas has been tested...regulators will be above grid by supression systems
|
Rough-in | 10/3/2012 | 10/3/2012 | 10/3/2012 | P | PEND |
Dixie Fellows
|
|
|
if questions call Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann..rescheduled for thurs am
|
Rough-in | 9/5/2012 | 9/6/2012 | 9/6/2012 | A | PASS |
Dixie Fellows
|
|
|
if questions call Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann...3--60lb tests from kitchen area to roof ok
|