Final | 10/22/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Dixie Fellows
|
|
|
jesse Phone #: ###-####
|
Final | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | NR |
Dixie Fellows
|
|
|
Drake Phone #: ###-####...need an air-balance report
|
Rough-in | 8/7/2012 | 8/8/2012 | 8/8/2012 | A | PART |
Dixie Fellows
|
|
|
Light inspection for wekded ducts-Drake Phone #: ###-####...light test ok...received documentation from engineer (musgrove) for change in size of the grease duct
|
Conference | 8/3/2012 | 8/6/2012 | 8/6/2012 | P | PEND |
Dixie Fellows
|
|
|
Drake--Early afternoon please Phone #: ###-####...need signed and stamped letter from the engineer for changes to the size of the grease duct, etc
|