Final | 11/1/2012 | 11/2/2012 | 11/2/2012 | P | PASS |
Dixie Fellows
|
|
|
Ollie-Please call 1 hour prior to inspection Phone #: ###-####
|
Final | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | FAIL |
Dixie Fellows
|
|
|
oleg - call for access Phone #: ###-####...unable to find air=balance report........need lower comb air at equipment enclosure
|
Rough-in | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PASS |
Dixie Fellows
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 8/17/2012 | 8/17/2012 | 8/17/2012 | P | PART |
Dixie Fellows
|
|
|
rough in & pressure test please-Oleg Phone #: ###-#### - plans are by fireplace....duct blaster ok...20lb gas ok...need to secure tabs at side of f/p and apply high temp sealant at screws
|
Rough-in | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | FAIL |
Dixie Fellows
|
|
|
Oleg Phone #: ###-####...no manual J for second furnace...oleg was on site
|