Final | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown
|
Final | 9/26/2012 | 9/26/2012 | 9/26/2012 | P | PEND |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown-need air balance report that writing can be seen.
|
Rough-in | 8/22/2012 | 8/23/2012 | 8/23/2012 | A | PASS |
Eric Strole
|
|
|
10 AM duct blast witness >> Inspection requested via web by Stephanie Brown-20 lb gas test, duct blast and rough-in pass.
|
Rough-in | 8/17/2012 | 8/22/2012 | 8/22/2012 | P | CANC |
Eric Strole
|
|
|
1:00 duct blast witness. Confirm with Scott ###-#### >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Rough-in | 8/16/2012 | 8/21/2012 | 8/17/2012 | P | CANC |
Troy James
|
|
|
1:30 pm duct blasting witness >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|