Final | 10/9/2012 | 10/10/2012 | 10/10/2012 | A | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown
|
Final | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | CANC |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Final | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown-need to finish filling out air balance report. (measured static pressure)
|
Rough-in | 8/22/2012 | 8/23/2012 | 8/23/2012 | A | PASS |
Eric Strole
|
|
|
10:30 aM duct blast witness >> Inspection requested via web by Stephanie Brown-20 lb gas test ,duct blast and rough-in pass.
|
Rough-in | 8/17/2012 | 8/22/2012 | 8/22/2012 | P | CANC |
Eric Strole
|
|
|
1:30 duct blast witness >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Rough-in | 8/16/2012 | 8/21/2012 | 8/17/2012 | P | CANC |
Troy James
|
|
|
1pm duct blasting witness >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|