Final | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Dixie Fellows
|
|
|
The lock box is located on the top of the electrical panel, so we will need an inspector tall enough to reach it. Phone #: ###-#### >> Inspection requested via web by Karl Hestekin
|
Final | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin..unable to reach lock-box on top of electrical panel
|
Final | 10/17/2012 | 10/18/2012 | 10/18/2012 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin...need to strap up supply runs
|
Rough-in | 9/19/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin
|
Rough-in | 9/17/2012 | 9/18/2012 | 9/18/2012 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin
|