Mec-Aging Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 | | DONE |
Troy James
|
|
|
|
Final | 3/4/2014 | 3/4/2014 | 3/4/2014 | P | PASS |
Troy James
|
|
|
|
Mec-Aging Inspection | 12/3/2013 | 12/3/2013 | 12/3/2013 | | CANC |
Troy James
|
|
|
|
Pressure Test | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | PART |
Troy James
|
|
|
JOB CONTACT IS COLIN Phone #: ###-#### >> Inspection requested via web by ADAM WARR ok test on chiller lines for air handler to cooling tower
|
Pressure Test | 2/1/2013 | 2/4/2013 | 2/4/2013 | A | CANC |
Troy James
|
|
|
JOB CONTACT IS KEITH ###-#### Phone #: ###-#### >> Inspection requested via web by MARGGIE BUSS scheduled inspection under wrong permit
|
Rough-in | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT IS KEITH Phone #: ###-#### >> Inspection requested via web by ADAM WARR ok hydronic mains 1st floor, Talked to john about getting correct permit for hydronics
|
Pressure Test | 1/7/2013 | 1/8/2013 | 1/8/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT IS KEITH JOHNSON Phone #: ###-#### >> Inspection requested via web by ADAM WARR ok test to hydronic in the basement.
|
Pressure Test | 1/4/2013 | 1/7/2013 | 1/7/2013 | A | PASS |
Troy James
|
|
|
JOB CONTACT IS COLIN Phone #: ###-#### >> Inspection requested via web by ADAM WARR witness 150# test to 6" chiller , 6" heating and 2" condenser lines from basement to 6th floor
|
Pressure Test | 11/15/2012 | 11/16/2012 | 11/16/2012 | P | PART |
Dixie Fellows
|
|
|
JOB CONTACT KEITH ###-#### Phone #: ###-#### >> Inspection requested via web by MARGGIE BUSS...TEMPORARY LINE FROM 60LB METER TO BASEMENT AND UP TO 2ND FLOOR..ISOLATION VAVLE EVERY 3 FLOORS.
|