Final | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 11/28/2012 | 11/29/2012 | 11/29/2012 | A | PASS |
Alan Hauser
|
|
|
20# and duct blast done
|
Rough-in | 11/28/2012 | 11/29/2012 | 11/28/2012 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Pressure Test | 11/27/2012 | 11/28/2012 | 11/28/2012 | P | PASS |
Dixie Fellows
|
|
|
Duct Blast test at 1:30 pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino....20lb gas ok...duct blaster ok
|
Rough-in | 11/27/2012 | 11/28/2012 | 11/28/2012 | P | FAIL |
Dixie Fellows
|
|
|
Duct Blast test at 1:30 pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino...missing supply duct in main room..check flue for double wall
|