Final | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Final | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino...where is outside termination for comb air at w/h in garage??
|
Final | 7/29/2013 | 7/30/2013 | 7/29/2013 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Final | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | FAIL |
Dixie Fellows
|
|
|
9:00 meet Jerry...need comb at for w/h"s at both enclosures
|
Final | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino...resheduled with jerry for 9:00 monday
|
Final | 7/23/2013 | 7/24/2013 | 7/24/2013 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Pressure Test | 6/21/2013 | 6/24/2013 | 6/24/2013 | A | PASS |
Bill VanDegrift
|
|
|
pressure test for the firepit Phone #: ###-#### >> Inspection requested via web by Debbie Marino 20# test ok will sleeve at the slab
|
Rough-in | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | DONE |
Troy James
|
|
|
new manual j changes, need to verify Verified rough installation is installed per the revised manual j.
|
Rough-in | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Dixie Fellows
|
|
|
9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino...r/i ok ..no duct blaster required
|
Pressure Test | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Dixie Fellows
|
|
|
9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino...20LB GAS OK
|
Conference | 2/13/2013 | 2/14/2013 | 2/14/2013 | A | PASS |
Dixie Fellows
|
|
|
9am per Dixie Phone #: ###-#### >> Inspection requested via web by Debbie Marino...walked job with jerry and discussed location of dante valve for f/p
|