Final | 1/9/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Dixie Fellows
|
|
|
Final inspection scheduled for 1/11/13pm. Please call Dana before you go at ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson
|
Pressure Test | 12/20/2012 | 12/21/2012 | 12/21/2012 | A | PASS |
Dixie Fellows
|
|
|
pressure test scheduled 12/21/12am. Dana can be reached at ###-#### if needed. Phone #: ###-#### >> Inspection requested via web by Echo Jackson...20lb gas ok
|
Pressure Test | 12/18/2012 | 12/20/2012 | 12/20/2012 | A | FAIL |
Dixie Fellows
|
|
|
pressure test scheduled for 12/20/12am. Dana can be reached at ###-#### if needed. Phone #: ###-#### >> Inspection requested via web by Echo Jackson....job not started yet
|