Final | 8/15/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Alan Hauser
|
|
|
|
Final | 8/13/2013 | 8/14/2013 | 8/15/2013 | A | CANC |
Alan Hauser
|
|
|
if questions call Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
|
Rough-in | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Alan Hauser
|
|
|
2nd floor hydronics test passed, whole system now tested
|
Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | PART |
Alan Hauser
|
|
|
all gaslines tested at 60#, ok
|
Pressure Test | 3/28/2013 | 4/1/2013 | 4/1/2013 | A | PART |
Alan Hauser
|
|
|
100# test passed for hydronics loop 1st floor
|
Pressure Test | 3/28/2013 | 3/29/2013 | 3/28/2013 | A | CANC |
Alan Hauser
|
|
|
if questions call John @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
|
Rough-in | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PART |
Alan Hauser
|
|
|
basement loop ok
|
Rough-in | 2/18/2013 | 2/19/2013 | 2/19/2013 | A | CANC |
Alan Hauser
|
|
|
if questions please contact Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
|