Final | 4/25/2013 | 4/25/2013 | 4/25/2013 | A | PASS |
Eric Strole
|
|
|
This permit was for rough-in only.
|
Rough-in | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Eric Strole
|
|
|
stephanie Phone #: ###-####-20 lb gas test and rough-in pass.
|
Rough-in | 3/6/2013 | 3/6/2013 | 3/6/2013 | A | PEND |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-There is a stop work issued on project. No inspections till stop work is taken off.
|
Rough-in | 3/5/2013 | 3/5/2013 | 3/5/2013 | P | FAIL |
Eric Strole
|
|
|
Troy has copy of manuel J updates and we should have it back this am. Framing inspection set for pm today. trying to get this in prior, as to not hold up builder. Thanks Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-Need 6" outside air to the return per the manual-j and need an R-8 insulation with a vapor barrier on supply in garage attic space.
|
Rough-in | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | FAIL |
Eric Strole
|
|
|
also pressure witness Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-Need approved manual-j on site for rough-in inspection.
|