Final | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Eric Strole
|
|
|
Jack Phone #: ###-####
|
Final | 6/13/2014 | 6/16/2014 | 6/16/2014 | A | PEND |
Dixie Fellows
|
|
|
call jack ###-####..jack will call the builder for access
|
Mec-Aging Inspection | 6/13/2014 | 6/13/2014 | 6/13/2014 | | PEND |
Dixie Fellows
|
|
|
i will call jack for access
|
Conference | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by jack hester
|
Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 | P | PASS |
Dixie Fellows
|
|
|
Pressure test also please--Jack Phone #: ###-####...r/i and 20lb gas ok...no manual J required
|
Conference | 3/11/2013 | 3/11/2013 | 3/11/2013 | P | PASS |
Dixie Fellows
|
|
|
Jack Phone #: ###-####...discussed ducting...no man j required..will need a duct blaster on new ductwork only
|