Final | 6/21/2013 | 6/24/2013 | 6/24/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PASS |
Eric Strole
|
|
|
Call Stewart at ###-#### if any questions concerning the Manual J and duct sizing Phone #: ###-#### >> Inspection requested via web by Debbie Marino-Need to check manual-j on final for revised manual-j and added run.
|
Rough-in | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-1-1st flr den supply is undersized per the manual-j.2-Need to hook-up all bath exhausts.3-need to adjust fresh air damper.4-need to protect gastite in bay with kitchen exhaust.
|
Pressure Test | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb gas test pass
|