Final | 7/11/2013 | 7/12/2013 | 7/12/2013 | A | PASS |
Bill VanDegrift
|
|
|
Please call Johny questions ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala
|
Pressure Test | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | PASS |
Bill VanDegrift
|
|
|
Please call Johny questions ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala 1-20# and 1-60# test ok
|
Final | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | CANC |
Troy James
|
|
|
Please call Johny with questions ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala Inspection cancelled from web by: Jennifer Alcala
|
Final | 7/10/2013 | 7/11/2013 | 7/11/2013 | A | CANC |
Troy James
|
|
|
Please call Johny with questions ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala Inspection cancelled from web by: Jennifer Alcala
|
Conference | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Dixie Fellows
|
|
|
Please call Brian when you are on your way ###-####. Phone #: ###-#### >> Inspection requested via web by Jennifer...met with brian to discuss location of future 3/4" gas from meter to fire pit in front of building
|
Rough-in | 4/30/2013 | 4/30/2013 | 4/30/2013 | A | PASS |
Dixie Fellows
|
|
|
this is a r/i for PVC that is buried under the future patio slab..later they will run csst through the pvc to a future fire-pit and they will test the line at that time.
|
Pressure Test | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | NR |
Dixie Fellows
|
|
|
Please call Brian with questions ###-####. Bid is for inspection on conduit line. Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala...gas line not installed yet
|