Final | 6/21/2013 | 6/21/2013 | 6/21/2013 | P | PASS |
Bill VanDegrift
|
|
|
|
Final | 6/19/2013 | 6/19/2013 | 6/19/2013 | A | FAIL |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown...doors locked....tried calling the contractor but the mail box is full
|
Rough-in | 5/14/2013 | 5/15/2013 | 5/15/2013 | A | PASS |
Dixie Fellows
|
|
|
stephanie ###-####...r/i and 20lb gas ok...duct blaster ok
|
Rough-in | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | PEND |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown...rescheduled for wed am
|
Rough-in | 5/13/2013 | 5/13/2013 | 5/14/2013 | P | FAIL |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown...THIS IS NOT THE APPROVED MANUAL J
|
Rough-in | 5/8/2013 | 5/9/2013 | 5/9/2013 | A | FAIL |
Dixie Fellows
|
|
|
>> Inspection requested via web by Stephanie Brown...manual j doesn't match equipment
|