Final | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 5/17/2013 | 5/20/2013 | 5/20/2013 | A | PASS |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####
|
Rough-in | 5/16/2013 | 5/17/2013 | 5/17/2013 | A | FAIL |
Dixie Fellows
|
|
|
Ollile Phone #: ###-####,,,c/n not done...must pay reinspection fee before next inspection
|
Rough-in | 5/16/2013 | 5/16/2013 | 5/16/2013 | P | PART |
Dixie Fellows
|
|
|
rough in and pressure test please-Ollie Phone #: ###-####...20lb gas ok..f/p ok...NEED DAMPER IN 6" OUTSIDE AIR AT R/A .....OK TO INSULATE
|
Pressure Test | 5/15/2013 | 5/15/2013 | 5/15/2013 | P | FAIL |
Dixie Fellows
|
|
|
Ollie-rough in also please Phone #: ###-####..NO MANUAL J ON SITE
|