Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberMEC13-02221
StatusFinaled
Name ALL-WAYS PLUMBING
Site Address 276 N 8TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Mechanical Permit - New: new gas line
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/11/20139/11/20139/11/2013PPASS
DetailsDixie Fellows
gas only
Final8/12/20138/13/20138/13/2013APART
DetailsDixie Fellows
Temporary final until hood is finaled,so store may open. Thanks, Dixie Phone #: ###-#### >> Inspection requested via web by lon holtzmaster..temp occ ok
Final7/31/20138/1/20138/1/2013PNR
DetailsDixie Fellows
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster---i will final this when BS&R is ready for their final
Pressure Test7/25/20137/26/20137/26/2013APASS
DetailsDixie Fellows
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster...20lb gas ok
Final7/23/20137/24/20137/24/2013ANR
DetailsDixie Fellows
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster..i will final when the rest of the job is complete
Pressure Test6/9/20136/10/20136/10/2013APART
DetailsBill VanDegrift
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster 20# test ok from the riser up to the first floor to the area by the back up generator in the basement. needs hanger at the base of the rise and above the brick wall penetration where it is resting on a flex conduit.
Pressure Test6/6/20136/7/20136/7/2013AFAIL
DetailsDixie Fellows
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster...is this a low or med pressure test?? you have a 100lb guage so you need a 60lb test