Final | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Dixie Fellows
|
|
|
Please call with any questions or concerns. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Roy...range lowered to meet clearances above.
|
Final | 10/8/2013 | 10/9/2013 | 10/9/2013 | A | CANC |
Bill VanDegrift
|
|
|
Thanks Dixie Phone #: ###-#### >> Inspection requested via web by Jennifer Roy not ready yet
|
Final | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | FAIL |
Dixie Fellows
|
|
|
need clearances above and sides of cook-top per manuf specs..need commercial listed gas flex connector with 1/2" ID...extend gas line to front of cook-top for access to shut-off gas per the manuf
|
Final | 9/27/2013 | 9/30/2013 | 9/30/2013 | A | NR |
Dixie Fellows
|
|
|
need manuf specs for range...hood needs to be wired so i can check for outside air...i have the air-balance reports
|
Final | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | NH |
Bill VanDegrift
|
|
|
Please call with any questions or concerns. THank you Phone #: ###-#### >> Inspection requested via web by Jennifer Roy just did floors again will reinspect monday
|
Rough-in | 6/27/2013 | 6/27/2013 | 6/27/2013 | P | PASS |
Dixie Fellows
|
|
|
Duct blaster test at 3:30. Please call with any questions or concerns. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Roy...r/i and 20lb gas ok...duct blaster ok...left a c/n for the super to check his clearance to combustible for the hood surround above where the gas cook-top will be
|