Conference | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Bill VanDegrift
|
|
|
9:00 MEET BOB AND DIXIE
|
Final | 9/11/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Dixie Fellows
|
|
|
met with bob t. and bill...changes are done and ready for final per all involved.
|
Conference | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Dixie Fellows
|
|
|
9:00 MEET BOB...met with bill v. and bob t. --we are all agreed that the changes made meet the intent of the code
|
Conference | 8/23/2013 | 8/26/2013 | 8/26/2013 | A | PASS |
Dixie Fellows
|
|
|
12:00 meet bob-bill...grade on grease duct ok...still determining best fix for smoke in alley..bob tikker will draw up a new plan
|
Conference | 8/23/2013 | 8/26/2013 | 8/26/2013 | A | PASS |
Bill VanDegrift
|
|
|
12:00 meet bob-dixie checking out the exhaust.
|
Conference | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Dixie Fellows
|
|
|
8:45 meet bob ticker to discuss job
|
Conference | 8/14/2013 | 8/19/2013 | 8/19/2013 | A | CANC |
Dixie Fellows
|
|
|
8:30 meet Bob Ticker on job...out sick so will reschedule with bob
|
Final | 8/8/2013 | 8/9/2013 | 8/9/2013 | A | PART |
Dixie Fellows
|
|
|
jesse Phone #: ###-####...temp ok...waiting on correct termination
|
Rough-in | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PASS |
Dixie Fellows
|
|
|
light test for jesse-- ###-####......light test on all grease duct ok..clean-outs in place..make-up air duct ok
|
Rough-in | 7/31/2013 | 8/1/2013 | 8/1/2013 | P | PEND |
Dixie Fellows
|
|
|
light inspection test//jesse Phone #: ###-####...unable to make it before jesse left so we rescheduled for fri am
|
Rough-in | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | PART |
Dixie Fellows
|
|
|
please call ahead for access for light testing - jesse Phone #: ###-####....make-up air duct in space next door ok for ceiling cover
|
Conference | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Dixie Fellows
|
|
|
Jesse Phone #: ###-####...met with Randy and Bob Ticker to review new drawings. Bob will resubmitt them
|