Final | 12/5/2013 | 12/6/2013 | 12/6/2013 | A | PASS |
Bill VanDegrift
|
|
|
Mike Phone #: ###-#### final ok
|
Final | 10/4/2013 | 10/7/2013 | 10/4/2013 | A | CANC |
Dixie Fellows
|
|
|
Manual J and reports with downstairs furnace - Shawn Phone #: ###-#### // per phone call from Shawn cancel inspection, will call back to reschedule 10/4/13 leg
|
Rough-in | 7/24/2013 | 7/25/2013 | 7/25/2013 | A | PASS |
Dixie Fellows
|
|
|
eric Phone #: ###-####...r/i and 20lb gas ok..duct blaster
|
Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | FAIL |
Dixie Fellows
|
|
|
mike Phone #: ###-#### or Eric ###-####..MANUAL J HASN'T BEEN APPROVED...NEED 30 LB GUAGE WITH A 20LB TEST
|