Final | 1/2/2014 | 1/3/2014 | 1/3/2014 | P | PASS |
Troy James
|
|
|
Onsite contact: Rob Butler Phone #: ###-#### >> Inspection requested via web by Melissa Kaae
|
Rough-in | 10/11/2013 | 10/14/2013 | 10/11/2013 | A | PART |
Troy James
|
|
|
6th Floor Rough In Rob ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs ok ducts at lobby to finish ceiling
|
Rough-in | 9/19/2013 | 9/20/2013 | 9/19/2013 | A | PART |
Troy James
|
|
|
6th Floor Cover Rough In ###-#### Rob Phone #: ###-#### >> Inspection requested via web by Allison Briggs high pressure ducts ok to cover
|
Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PART |
Troy James
|
|
|
6th Floor TI: Approve to cover insulation. ###-#### Rob Butler Phone #: ###-#### >> Inspection requested via web by Allison Briggs ok to insulate ducts
|