Final | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Alan Hauser
|
|
|
|
Final | 12/18/2013 | 12/18/2013 | 12/18/2013 | A | PART |
Jim Johnson
|
|
|
Please call Floyd if you have any questions, Thank you! Phone #: ###-#### >> Inspection requested via web by Floyd Floyd Peek need air balance report on site for final called contractor will recall when ready
|
Pressure Test | 9/17/2013 | 9/17/2013 | 9/17/2013 | P | PASS |
Alan Hauser
|
|
|
2-60# test ok, by final will need metal shroud around gas pipe penetration through foundation
|
Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PASS |
Troy James
|
|
|
Duct changes approved by Troy Phone #: ###-#### >> Inspection requested via web by Floyd Floyd Peek
|
Rough-in | 7/25/2013 | 7/25/2013 | 7/25/2013 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Floyd Floyd Peek installed duct design does not match approved manual j. Need to resubmit manual j. Need exhaust ducted at powder room and dryer duct installed. No equipment installed at this time. NO duct blast test done.
|
Pressure Test | 7/25/2013 | 7/25/2013 | 7/25/2013 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Floyd Floyd Peek 20# test
|
Rough-in | 7/18/2013 | 7/18/2013 | 7/18/2013 | P | NR |
Alan Hauser
|
|
|
recall when attic duct and insulation is done and support all exhaust duct. 1" clearance at roof sheathing for b-vent. no gas piping
|