Final | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Dixie Fellows
|
|
|
Pleasse call and let me know if we passed thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez
|
Final | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | CANC |
Dixie Fellows
|
|
|
Please call me when inspection has been completed to let me know if we passed. Thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez Inspection cancelled from web by: Jose Rodriguez
|
Pressure Test | 7/24/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Eric Strole
|
|
|
Plese call Joe when test is Completed Thanks Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez-20 lb gas test pass
|
Pressure Test | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | FAIL |
Dixie Fellows
|
|
|
Please call Joe when it has been completed. Thanks Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez...leak
|
Rough-in | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Dixie Fellows
|
|
|
Please call Joe when it has been completed. Thanks Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez
|