Final | 10/1/2013 | 10/2/2013 | 10/2/2013 | A | PASS |
Dixie Fellows
|
|
|
final Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | FAIL |
Alan Hauser
|
|
|
provide to hvac equipment on lower roof and remove vent limitors at mp gas regulators and protect openings with listed caps
|
Final | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | PART |
Alan Hauser
|
|
|
signed temp. occ.
|
Final | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | FAIL |
Alan Hauser
|
|
|
correction notice at hood
|
Conference | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | PASS |
Bill VanDegrift
|
|
|
light test Phone #: ###-#### >> Inspection requested via web by Brandon light test on grease duct ok
|
Rough-in | 9/13/2013 | 9/16/2013 | 9/16/2013 | A | FAIL |
Bill VanDegrift
|
|
|
7 am light test leaks
|
Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | FAIL |
Bill VanDegrift
|
|
|
Grease duct light test Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
Conference | 8/27/2013 | 8/28/2013 | 8/28/2013 | A | PART |
Troy James
|
|
|
Light test for grease duct - am Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen ok welds to the first two welded joints from hood
|
Rough-in | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PART |
Alan Hauser
|
|
|
wall behind grease hood ok
|
Rough-in | 8/16/2013 | 8/19/2013 | 8/19/2013 | A | FAIL |
Alan Hauser
|
|
|
contact troy james about clearances at class 1 hood
|
Rough-in | 8/15/2013 | 8/16/2013 | 8/16/2013 | A | PART |
Eric Strole
|
|
|
Cover Inspections Restrooms Phone #: ###-#### >> Inspection requested via web by David Tully-restrooms ok for cover
|
Rough-in | 8/13/2013 | 8/14/2013 | 8/14/2013 | A | CANC |
Bill VanDegrift
|
|
|
Luke - rough in inspection Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen Inspection cancelled from web by: David Tully
|
Conference | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | PASS |
Alan Hauser
|
|
|
ok to set make-up air unit on existing roof structure
|