Final | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Alan Hauser
|
|
|
|
Final | 9/25/2013 | 9/26/2013 | 9/26/2013 | P | FAIL |
Alan Hauser
|
|
|
this house is still in r/i stage
|
Pressure Test | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PASS |
Eric Strole
|
|
|
Pressure test inspection at 10am Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb gas test pass
|
Pressure Test | 7/31/2013 | 8/1/2013 | 8/1/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-no gas pipe installed
|
Rough-in | 7/31/2013 | 8/1/2013 | 8/1/2013 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|