Final | 11/14/2013 | 11/18/2013 | 11/18/2013 | A | PASS |
Dixie Fellows
|
|
|
Hello Dixie Keri told us the floors would be ready today. Thank you >> Inspection requested via web by Dustin Rich
|
Final | 11/11/2013 | 11/12/2013 | 11/12/2013 | A | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich...i have no access as they are doing the floors...plz dont reschedule until youre sure it's done
|
Final | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | FAIL |
Troy James
|
|
|
installer scott ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich ducts in crawl required to be insulated minimum of r-6 and unable to locate air balance reports
|
Rough-in | 9/10/2013 | 9/11/2013 | 9/11/2013 | P | DONE |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich...this was already passed
|
Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich...R/I AND 20LB GAS OK PER TROY JAMES
|
Final | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|
Rough-in | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich supply ducts size installed does not match report, no duct blast test done
|
Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | NR |
Dixie Fellows
|
|
|
Also a pressure test please--Carrie-this is the builder or ###-#### Dustin for questions Phone #: ###-####...waiting for new Manual J
|