Final | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/4/2013 | 9/4/2013 | 9/4/2013 | P | PASS |
Alan Hauser
|
|
|
d.b. done and 20# test
|
Rough-in | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | NR |
Alan Hauser
|
|
|
hvac ok, need to finish framing at 2nd flr. dryer exhaust duct
|
Pressure Test | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | PASS |
Alan Hauser
|
|
|
20#
|