Final | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tim Petsche
|
Rough-in | 9/19/2013 | 9/20/2013 | 9/23/2013 | P | PASS |
Eric Strole
|
|
|
pool room Phone #: ###-#### >> Inspection requested via web by Tim Petsche-Need to add furnace and exhaust to permit by final.
|
Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Alan Hauser
|
|
|
20# and 60# test ok, no sign that d.b. has been done
|
Rough-in | 9/4/2013 | 9/5/2013 | 9/5/2013 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tim Petsche Need to complete crawl and have approved stamped manaul j onsite. Need 10" duct with 12x12 boot to bedroom 2. Gas piping and 60# test to meter ok. 20# test to appliances ok No appliances set and no duct blast verified..
|