Final | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Pratley
|
Final | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | FAIL |
Troy James
|
|
|
Jordan Phone #: ###-#### gas regulator at water heater needs to have a shutoff valve and sediment trap before the regulator. Regulator shall be mounted in horizontal position unless stated differently by manufacturer. Need to have test port 10 pipe diameters downstream of regulator. Need to complete termperature pressure relief drain and condensate drain to an approved location.
|
Rough-in | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Troy James
|
|
|
JUDY Phone #: ###-#### ok upon receiving new manual j report, ok to cover No duct blast test
|
Pressure Test | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Troy James
|
|
|
JUDY Phone #: ###-#### 60# test
|
Rough-in | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | NR |
Bill VanDegrift
|
|
|
shane Phone #: ###-#### need the approved ACCA report
|
Rough-in | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | NR |
Bill VanDegrift
|
|
|
contact ###-#### no report on site
|
Conference | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Judy Van Cleave
|