Final | 12/26/2013 | 12/27/2013 | 12/27/2013 | P | PASS |
Bill VanDegrift
|
|
|
oleg Phone #: ###-#### final ok
|
Final | 12/20/2013 | 12/23/2013 | 12/23/2013 | A | FAIL |
Bill VanDegrift
|
|
|
Ollie-Please call prior to insepction for garage code Phone #: ###-#### 1) needs test on PVC furnace flue 2) no access, Olegs message mechane is full.
|
Rough-in | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | FAIL |
Alan Hauser
|
|
|
hvac ok and pt ok, still need 5# test on plastic flue
|
Pressure Test | 10/8/2013 | 10/8/2013 | 10/8/2013 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 10/7/2013 | 10/8/2013 | 10/8/2013 | A | FAIL |
Alan Hauser
|
|
|
finish framing at 2nd floor b-vent and need 5# test on flue piping
|