Final | 10/14/2013 | 10/14/2013 | 10/14/2013 | P | PASS |
Dixie Fellows
|
|
|
Ken/Shirley, ###-####. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Final | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | NR |
Eric Strole
|
|
|
As late in the afternoon as possible. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas-not ready
|
Final | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PART |
Eric Strole
|
|
|
Late afternoon please, will need flue test. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas-test on flue pass. install not ready.
|
Pressure Test | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PASS |
Eric Strole
|
|
|
Late afternoon please. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas-20 lb gas test pass
|