Final | 12/5/2014 | 12/5/2014 | 12/5/2014 | P | PASS |
Alan Hauser
|
|
|
|
Final | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PART |
Alan Hauser
|
|
|
PARTIAL FINAL Boiler Room. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Pressure Test | 8/27/2014 | 8/27/2014 | 8/27/2014 | P | PASS |
Alan Hauser
|
|
|
60# test ok on gasline to new boilers
|
Final | 4/15/2014 | 4/16/2014 | 4/16/2014 | A | PART |
Alan Hauser
|
|
|
OR Addition ONLY final. this area ok for occupancy
|
Rough-in | 4/4/2014 | 4/7/2014 | 4/7/2014 | A | PART |
Chad Schwendiman
|
|
|
ceiling cover AREA C. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann -Area C ok to cover
|
Rough-in | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PART |
Troy James
|
|
|
Above Ceiling RI Cover. if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann ok ceiling tile at west side only
|
Pressure Test | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PART |
Troy James
|
|
|
OR Addition - If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann inspected chiller/glycol lines to heat pumps, missing hangers at a couple heat pumps
|
Pressure Test | 3/7/2014 | 3/7/2014 | 3/7/2014 | P | PART |
Alan Hauser
|
|
|
hydronic pressure test. ok for hot side, found cracked coupling on cold side
|
Rough-in | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PART |
Alan Hauser
|
|
|
ok for tile
|
Rough-in | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PART |
Alan Hauser
|
|
|
chilled and hot hdronic loop ok in addition 100# test ok
|
Pressure Test | 11/13/2013 | 11/14/2013 | 11/14/2013 | A | PART |
Alan Hauser
|
|
|
2-60# test ok for piping to temporary heaters
|