Final | 12/27/2013 | 12/27/2013 | 12/27/2013 | P | PASS |
Bill VanDegrift
|
|
|
Oleg Phone #: ###-####
|
Final | 12/26/2013 | 12/26/2013 | 12/26/2013 | P | FAIL |
Jim Johnson
|
|
|
oleg Phone #: ###-#### need to remove pvc fitting and piping on T&P drain line and repipe with approved material CPVC, COPPER, OR GALVANIZED STEEL PIPING and pipe T&P drain line to garage floor correction notice on water heater on site contractor to recall when ready
|
Final | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | FAIL |
Troy James
|
|
|
oleg Phone #: ###-#### need water heater pan and pressure relief valve installed
|
Rough-in | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | FAIL |
Alan Hauser
|
|
|
need 5# test on flue
|
Pressure Test | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | PASS |
Alan Hauser
|
|
|
20#
|