Final | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Dixie Fellows
|
|
|
FINAL
|
Final | 3/17/2014 | 3/17/2014 | 3/17/2014 | P | NR |
Dixie Fellows
|
|
|
Gas Line Final Phone #: ###-#### >> Inspection requested via web by Travis Baker..WAITING FOR ALL EQUIPMENT TO BE INSTALLED AND CONNECTED
|
Pressure Test | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PASS |
Dixie Fellows
|
|
|
Wrangler Williams - contact Phone #: ###-#### >> Inspection requested via web by Travis Baker...2--20lb gas tests ok
|
Pressure Test | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | FAIL |
Dixie Fellows
|
|
|
Could you make this inspection the last one you do today? Thnaks Phone #: ###-#### >> Inspection requested via web by Travis Baker...gas line to 2--rtu's undersized..need 1" to both units
|