Final | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Dixie Fellows
|
|
|
This is A FLUE PRESSURE TEST AND FINAL INSPECTION. Pls meet installer at home at 10AM. Install Mgr, Allen, Phone # is ###-####. Pls call homeowner prior to inspect at ###-####. Phone #: ###-#### >> Inspection requested via web by Jill Gunshore
|
Pressure Test | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Dixie Fellows
|
|
|
This is A FLUE PRESSURE TEST AND FINAL INSPECTION. Pls meet installer at home at 10AM. Install Mgr, Allen, Phone # is ###-####. Pls call homeowner prior to inspect at ###-####. Phone #: ###-#### >> Inspection requested via web by Jill Gunshore...flue test ok
|
Final | 12/30/2013 | 1/2/2014 | 1/2/2014 | P | FAIL |
Jim Johnson
|
|
|
This is a Final Inspect. We fixed the red tags that Eric Strole requested. This is a PM inspect. Pls call customer prior to inspect at ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson need to provide pressure test on flue for final called contractor will recall when ready
|
Pressure Test | 12/26/2013 | 12/30/2013 | 12/30/2013 | A | FAIL |
Eric Strole
|
|
|
This is a Flue Pressure Test and FINAL Inspect. Pls meet our installers at home at 10AM. Install Mgr, Allen , Ph# is ###-####. Pls call homeowner prior to inspect at ###-#### Phone #: ###-#### >> -Inspection requested via web by Echo Jackson-pressure test fail.
|