Final | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Eric Strole
|
|
|
Oleg Phone #: ###-####
|
Final | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | FAIL |
Eric Strole
|
|
|
Oleg Phone #: ###-####-no air balance report on site
|
Final | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | FAIL |
Eric Strole
|
|
|
Oleg Phone #: ###-####-Need to rebalance house
|
Rough-in | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | PASS |
Eric Strole
|
|
|
Oleg Phone #: ###-####-20 lb gas test and rough-in pass
|
Rough-in | 1/13/2014 | 1/13/2014 | 1/13/2014 | P | FAIL |
Eric Strole
|
|
|
Oleg Phone #: ###-####-corrections are not complete
|
Rough-in | 1/8/2014 | 1/8/2014 | 1/8/2014 | P | FAIL |
Troy James
|
|
|
oleg Phone #: ###-#### main supply duct above walk in closet is smashed and supply branch to walk in closet is smashed. No enough room in trusses for the ducts.
|
Pressure Test | 1/8/2014 | 1/8/2014 | 1/8/2014 | P | PASS |
Troy James
|
|
|
oleg Phone #: ###-#### 20# test
|