Final | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PASS |
Chad Schwendiman
|
|
|
Contact Stan ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty
|
Final | 3/12/2014 | 3/13/2014 | 3/12/2014 | P | CANC |
Chad Schwendiman
|
|
|
Contact Stan ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty Inspection cancelled from web by: Dan Flaherty
|
Rough-in | 3/11/2014 | 3/11/2014 | 3/11/2014 | P | PASS |
Chad Schwendiman
|
|
|
Rough in to look at Fire dampers from RTU''s Please make this later in the day. Brian ###-#### will have the duct opened up for your inspection of Fire damper angles. Phone #: ###-#### >> Inspection requested via web by Dan Flaherty
|
Final | 3/7/2014 | 3/10/2014 | 3/10/2014 | A | FAIL |
Troy James
|
|
|
Contact Stan Lillquist ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty fire dampers still not installed correctly
|
Rough-in | 3/5/2014 | 3/5/2014 | 3/5/2014 | P | FAIL |
Troy James
|
|
|
Rough in for cover. Contact Brian ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty Fire damper not isntalled correctly. Need to see installation instructions to verify. All flex duct connections required to be sealed with tape or mastic.
|
Pressure Test | 2/21/2014 | 2/25/2014 | 2/25/2014 | A | PASS |
Alan Hauser
|
|
|
20#
|
Conference | 1/15/2014 | 1/16/2014 | 1/16/2014 | A | DONE |
Troy James
|
|
|
meet dixie and stan at 9:00 talked over fire damper requirements at roof/ceiling assembly
|
Conference | 1/15/2014 | 1/16/2014 | 1/16/2014 | A | PASS |
Dixie Fellows
|
|
|
meet troy and stan 9:00...discussed fire dampers
|
Conference | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PEND |
Dixie Fellows
|
|
|
Please call Stan Lillquist ###-#### as early as possible so we can have the General Contractor attend this conference with us. Thanks Phone #: ###-#### >> Inspection requested via web by Dan Flaherty...rescheduled to meet troy//stan thurs am
|