Final | 5/2/2014 | 5/5/2014 | 5/5/2014 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero
|
Final | 5/2/2014 | 5/5/2014 | 5/2/2014 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero Inspection cancelled from web by: Dan Otero
|
Rough-in | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero..f/p ok
|
Rough-in | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero..need to frame back of f/p to meet the clearances required per the manuf
|