Final | 4/1/2014 | 4/2/2014 | 4/2/2014 | P | PASS |
Chad Schwendiman
|
|
|
WE FIXED THE: Upper combustion air duct is almost completely covered by insulation & the roof joist running through it. the duct needs to be extended above the insulation level to prevent blocking. Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
Final | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Please Call Robbie ###-#### @ Jims Heating Prior To Inspection. Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna - Upper combustion air duct is almost completely covered by insulation & the roof joist running through it. the duct needs to be extended above the insulation level to prevent blocking.
|