Final | 7/10/2014 | 7/14/2014 | 7/14/2014 | A | PASS |
Eric Strole
|
|
|
doug Phone #: ###-####
|
Pressure Test | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer-20 lb gas test and flue test pass
|
Pressure Test | 4/10/2014 | 4/10/2014 | 4/10/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer - 5LB flue pressure on 2nd. floor unit fail
|
Rough-in | 4/10/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer - Still need to do duct blast before final.
|