Final | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Chad Schwendiman
|
|
|
Mechanical rough in with gas pressure Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
Pressure Test | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Chad Schwendiman
|
|
|
Mechanical rough in with gas pressure Phone #: ###-#### >> Inspection requested via web by Konrad Swartz - 20LB gas pressure pass
|