Final | 10/6/2014 | 10/6/2014 | 10/6/2014 | A | PASS |
Chad Schwendiman
|
|
|
The gas test has been completed, this needs to be finaled out.
|
Conference | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | PASS |
Chad Schwendiman
|
|
|
Thank you. Phone #: ###-#### >> Inspection requested via web by Sean Hyten - 20LB gas pressure pass.
|
Conference | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | FAIL |
Chad Schwendiman
|
|
|
Please call Sean at the number listed. Thank you. Phone #: ###-#### >> Inspection requested via web by Sean Hyten - Failed pressure test. Need to have 20LBS or more on the gauge. it only had 17LBS when i got there.
|
Conference | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | CANC |
Chad Schwendiman
|
|
|
Please call Sean at the number listed. Thank you. Phone #: ###-#### >> Inspection requested via web by Sean Hyten
|
Final | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Please call Sean at the above number when you are inspecting. Thank you! Phone #: ###-#### >> Inspection requested via web by Sean Hyten - Faulty gauge
|