Final | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Dixie Fellows
|
|
|
final ok
|
Final | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
Final | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker..DARRIN THINKS THE EQUIPMENT WILL BE HERE MONDAY
|
Final | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker..waiting for other contractor
|
Final | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker..need to put traps on condensates
|
Pressure Test | 5/9/2014 | 5/9/2014 | 5/9/2014 | P | PASS |
Troy James
|
|
|
Gas manifold behind kitchen equipment is installed and is back on test >> Inspection requested via web by Travis Baker
|
Pressure Test | 5/7/2014 | 5/7/2014 | 5/7/2014 | P | PART |
Bill VanDegrift
|
|
|
Pressure gauge is located by gas meter (2psi system) Phone #: ###-#### >> Inspection requested via web by Travis Baker 60# test meter to rtu's and down to water heaters in basement. header at cookline not done.
|