Final | 9/17/2014 | 9/18/2014 | 9/18/2014 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by john shay
|
Rough-in | 5/17/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by john shay..r/i and 20lb gas ok..duct blast ok..blue tests on 2 furn and w/h ok
|
Rough-in | 5/13/2014 | 5/14/2014 | 5/14/2014 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by john shay Inspection cancelled from web by: john shay Inspection cancelled from web by: john shay
|